Environmental Impact Statement/Environmental Screening Report

This section includes PDF files of the complete final Environmental Impact Statement/ Environmental Screening Report (EIS/ESR) which are available for download.  The document has been prepared to satisfy both the federal and provincial environmental assessment requirements.

The results of the Screening indicate that there are no significant negative environmental effects, following implementation of appropriate mitigation measures; therefore, BWP Wind Limited Parternship intends to proceed with the project.

Public and Agency Review Period

Under the MOE’s Environmental Screening Process, the ESR is required to be made available for a public and agency review period for a minimum of 30 calendar days. Accordingly, the ESR will be available from March 26th, 2009 to April 24th, 2009.

Electronic copies can be downloaded below, and hard copies are available at:

The Town of Kingsville municipal office
2021 Division Rd N
Kingsville, ON N9Y 2Y9
Telephone (519) 733-2305

In accordance with the Screening Process, any persons/parties with outstanding environmental concerns about the Arner Greeb Wind Farm should raise their concerns with Wind Prospect. Concerns must be received by April 24th, 2009, and should be directed to:

Austen Hughes, Arner Green Project Manager
1791 Barrington St., Suite 1030
Halifax, NS B3J 3L1
arnergreen@windprospect.ca
austen.hughes@windprospect.ca
(902) 422 9663 x 215

If it is not possible to resolve the issue during the review period, the concerned person/party may make a written request to the Director of the Environmental Assessment and Approvals Branch as per the details below to elevate the project to either an Environmental Review or to an individual Environmental Assessment (“EA”). The Director must receive the elevation request by April 24th, 2009.

Important:

Elevation requests must be made in accordance with the provisions set out in the MOE’s Guide to EA requirements for electricity projects (available online at: http://www.ene.gov.on.ca/envision/gp/4021e.pdf), and a copy must also be sent to Wind Prospect at the aforementioned address.

Director of Environmental Assessment and Approvals Branch
Ministry of the Environment
Floor 12A, 2 St. Clair Avenue West
Toronto, ON M4V 1L5

EIS/ESR Sections:

VOLUME 1 : 26th Mar 2009

Volume 1 contains the main body of the EIS/ESR.

PDF documentVOLUME 1 MAIN TEXT

VOLUME 2 : 26th Mar 2009

Volume 2 contains the figures referenced within Volume 1 of the EIS/ESR.

 

PDF documentARNER GREEN VOLUME 2

VOLUME 3 : 26th Mar 2009

Volume 3 contains the appendicies referenced within Volume 1 of the EIS/ESR.

Appendix A: Consultancy : 26th Mar 2009

PDF documentAppendix A

Appendix B: MOE Screening Checklist : 26th Mar 2009

PDF documentAppendix B

Appendix C: Avian Impact Assessment : 26th Mar 2009

PDF documentAppendix C

Appendix D: Noise Impact Assessment : 26th Mar 2009

PDF documentAppendix D

Appendix E: Shadow Flicker Assessment : 26th Mar 2009

PDF documentAppendix E

Appendix F: Archaeology Assessment : 26th Mar 2009

PDF documentAppendix F

Appendix G: Species at Risk : 26th Mar 2009

PDF documentAppendix G

Appendix H: Turbine Specification : 26th Mar 2009

PDF documentAppendix H

Appendix I: Turbine Marking and Lighting : 26th Mar 2009

PDF documentAppendix I

Appendix J1: Notice of Commencement : 26th Mar 2009

PDF documentAppendix J1

Appendix J2: Public Meeting #1 : 26th Mar 2009

PDF documentAppendix J2

Appendix J3: Federal Consultation : 26th Mar 2009

PDF documentAppendix J3

Appendix J4: Provincial Consultation : 26th Mar 2009

PDF documentAppendix J4

Appendix J5: Local Consultation : 26th Mar 2009

PDF documentAppendix J5

Appendix J6: First Nation Consultation : 26th Mar 2009

PDF documentAppendix J6

Appendix J7: Public Meeting #2 : 26th Mar 2009

PDF documentAppendix J7

Appendix J8: Notice of Completion : 26th Mar 2009

PDF documentAppendix J8

Appendix K: Comms : 26th Mar 2009

PDF documentAppendix K

Appendix L: Bats Impact Assessment : 26th Mar 2009

PDF documentAppendix L

Appendix M: NAV Canada Clearance : 26th Mar 2009

PDF documentAppendix M

Arner Green
Home - The Wind Farm - Facts & figures - Why here? - Predicted views - Community benefits - What's happening? - Community - Consultants - Studies - Milestones - The process - Wind monitoring - Development - Planning - Construction - Operation - About us - Values & history - How we work - Wind energy - FAQ's - Education - Links - Picture gallery - Contact us - Have your say - Search - Terms, Conditions & Disclaimer

Copyright © 2012 - Wind Prospect Ltd

Content Management System and Database Design BristolContent Management System and Database Design Bristol